ALMER has undertaken project assignments involving sanitary landfill and municipal solid waste disposal facilities, including engineered landfill development and the rehabilitation of uncontrolled disposal sites. Its documented services have included implementation design documentation, site development and rehabilitation planning, environmental assessment, bills of quantities and support for project approval procedures. Depending on the agreed project scope, technical work considers landfill layout and staged operation, environmental containment requirements, leachate and surface-water management, landfill gas investigations, earthworks and long-term environmental protection. This expertise supports municipal authorities and infrastructure developers from initial project assessment through design and regulatory coordination.

ALMER’s engineering portfolio includes preliminary and detailed implementation project assignments for mineral storage and mine waste facilities. Its recorded experience covers fine-grained mineral material storage and engineered mine waste disposal infrastructure, together with documentation and approval coordination under the applicable environmental and waste management requirements. Relevant engineering considerations include facility geometry and containment, site drainage, seepage and erosion control, embankments and slope stability, and the interaction between the proposed facility and surrounding land and water resources. The level of engineering analysis and any supporting environmental assessment is defined for each project according to its actual contract and regulatory requirements.

ANKA YUMURTA “EGG CHICKEN PRODUCTION FACILITY AND FEED PRODUCTION FACILITY” CONSTRUCTION WORK The EIA Report of the “Egg Poultry Production Facility and Feed Production Facility” planned to be established by ANKA Yumurta San. ve Tic. A.Ş. on an area of ​​approximately 136,922.69 m2 was prepared by Almer Proje and the EIA Positive Decision was taken.

Subsequently, the construction works of the Project started, and the construction activities of 3 coops, 1 chick house, administrative building and social facilities were completed by COEN Yapı along with the surrounding of the project area with wire fence. The facility has started operating. ARI COEN YAPI HAS BEEN COMPLETED.

AKSARAY OSB “WASTEWATER TREATMENT PLANT” PROJECT APPROVAL FILE HAS BEEN PREPARED BY ALMER PROJECT AND PROJECT APPROVAL HAS BEEN RECEIVED.

It is planned to carry out “SÜTAŞ East Southeastern Anatolia Dairy Project – Bingöl Integrated Facilities” on an area of ​​approximately 3,209,155.22 m2 within the borders of Bingöl Province, Central District by Sütaş Süt Ürünleri A.Ş. The EIA Studies of the said project were carried out by Almer Proje, the report was finalized and the EIA Positive Decision was taken.

Our work on the construction, installation and commissioning of Waste Oil, Sludge and Slop waste tanks within the scope of the Renovation and Construction works of the Waste Acceptance Unit for the Coastal Facility operated by Socar Turkey Akaryakıt Taşıma A.Ş. within the borders of the Aliağa district of İzmir province continues.